American Track constructed the first two phases of a major track infrastructure expansion at Jefferson Energy. A partial redesign was required after American Track discover multiple errors in the original design (by others). The redesign was required to meet railroad standards and strict deadlines. American Track completed the redesign in under a week. The Project consisted of ladder tracks which greatly increased the facility’s car capacity.
- 16,120 total track feet
- 12 No. 9 Turnouts
- 3 No. 10 Turnouts
- 1 crossover